MUTCD Sign ChartMUTCDSignChartA Public Ready Knowledge Resource

M4-9 Detour (Right Arrow)

Combines the word DETOUR with a directional arrow to point drivers toward the correct turn along the detour route. The official FHWA designation is M4-9 “Detour”; this site labels the right- and left-arrow orientations as M4-9 (Right Arrow) and M4-9L (Left Arrow) only to distinguish the two directions.

Sign Name
Detour (Right Arrow)
General Meaning
Combines the word DETOUR with a directional arrow to point drivers toward the correct turn along the detour route.
MUTCD Code
M4-9
Typical Use
Along the detour route at each decision point.
Sign Category
Detour Signs

Specifications

Standard Shape
Rectangle (Horizontal)
Background Color
Orange
Legend / Symbol
Black legend
Border
Black
Reflectivity
High Intensity (for nighttime visibility)
Compliance
MUTCD / CA MUTCD

Standard Sizes (inches)

  • Conventional Rectangle (Horizontal)24"–48" tall
  • Expressway Rectangle (Horizontal)36"–60" tall
  • Freeway Rectangle (Horizontal)48"–72" tall
View all standard sizes and options

Material / Application Notes

Decision points and turns along a detour. Confirm placement and supplemental plaques against the applicable CA MUTCD standard.

View this sign on the Federal MUTCD (FHWA)

California Notes

California-specific application notes and adoptions may differ. Review California requirements where applicable.

Go to California Notes
M4-9 Detour (Right Arrow) — official FHWA layout

What It Means / When This Sign Is Used

In the field, M4-9 Detour (Right Arrow) is typically positioned at the along the detour route at each decision point. Common deployments include decision points and turns along a detour; used in sequence with M4-8 DETOUR markers; common on local-street detours around closures. Always confirm its size, retroreflective sheeting, spacing, and placement against the CA MUTCD 2026 and the reviewing agency before finalizing the traffic control plan.

Learn more about Detour (Right Arrow) sign requirements

When & Where It's Used

  • Decision points and turns along a detour
  • Used in sequence with M4-8 DETOUR markers
  • Common on local-street detours around closures

Placement on a Traffic Control Plan

Where it sits
Along the detour route at each decision point.
CA MUTCD reference
CA MUTCD Part 6, Chapter 6F, and Part 2D (Guide Signs)
Typical minimum size
24" × 12" (route marker / plaque)

California / Field Use Notes

Placed at detour decision points in California to direct each turn, keeping detoured traffic on the approved alternate route.

In Los Angeles, this sign must conform to CA MUTCD 2026. Work in City of LA right-of-way is reviewed by StreetsLA and the Bureau of Engineering (BOE); state highways in LA County are permitted and reviewed by Caltrans District 7; county roads are permitted by LA County DPW. Sizes, retroreflectivity, and placement must meet CA MUTCD minimums — local agencies may require larger signs based on roadway class, speed, pedestrian volume, and proximity to schools or transit.

Common Plan Review Comments

  • Detour not signed continuously at every decision point.
  • Arrow direction incorrect at a turn.
  • Detour does not return traffic to the original route.
  • Pedestrian detour not addressed where sidewalks are affected.

Verify arrow direction at every turn and that no decision point is left unsigned. Public Ready reviews detour turn-by-turn guidance.

Educational reference only. This is not an official Caltrans, FHWA, or local agency publication and is not legal or engineering advice. Always verify sign selection, size, placement, spacing, and application against the current CA MUTCD 2026, Caltrans sign specifications, Standard Plans, project documents, and the reviewing agency’s requirements. Local jurisdictions may impose additional requirements, and final selection, placement, and dimensions may require engineering judgment or agency approval. Written against California MUTCD 2026 (effective January 18, 2026) and the Federal MUTCD 11th Edition. Official sources last verified June 2026.

Need to Rent or Purchase This Sign? Contact Public Ready.

Public Ready supports sign selection, project-ready sign packages, and equipment sourcing through qualified providers — with expert support built for compliance.